This project involved the fully engineered capping of approx. 18,000m² of the Phase 3 area of the existing Aughnagun landfill site, together with associated surface water drainage.
Works included:
- Earthworks
- Engineered Landfill Capping Works, including installing GCL Impermeable Liner and Gas & Drainage Geocomposites
- Drainage
- Gas extraction infrastructure
- Leachate collection & pumping infrastructure amendments
- Landscaping