The project comprised the widening of the existing North Down Coastal Path at Seapark, between Holywood and Cultra Avenue, Co. Down, to create a 2.5m wide foot and cycle path along the route. Associated works included the construction of DDA compliant concrete ramps, steps and edge protection railings.
Works included:
- Site Clearance
- Earthworks
- Pavement works
- Erection of edge protection railings
- Reinforced concrete steps, ramps and retaining walls
- Masonry retaining walls
- Drainage
- Rock Armour
- Works influenced by tidal conditions
- Works were completed adjacent to Belfast Lough, designated ASSI & SAC